Todo

Building 7 Comments »

A bit of a update, now that we are nearly done I can put whats left into a short (or long?) list.

Things to do before test inflation:

  • Finish off turning vents (nearly done)
  • Sew mouth and vent finishing tapes on
  • Sew on 30 vent attachment points (10 x 3 positions for adjustability)
  • Sew on the turning vent pulley attachment points
  • Sew in vent line anchor point
  • Cut out and sew on rego
  • Pre-Shrink vent lines in the oven, then cut to size

Only little things left to do now, but it seems these are the things that take the most time!!